Brybil as lead with Ledcor and Thurber and NHC as subs under a design-build agreement. Design and engineering construction services.

Scope:
The Project currently includes the following components:
  • Design and construction of an approximately 235m four-span bridge with two spans over the river and two short end spans upstream of the existing Haisla Bridge, complete with Multi-Use Path.
  • Realignment of the roadway approaches and sidewalks.
  • Realignment of utilities (storm, sanitary, water, power, communications, and natural gas) along the new bridge.
  • Design and construction of alternate access to effected properties.
  • Traffic management during construction to maintain access across the existing Haisla Bridge and to adjacent properties for all transportation modes.
  • Demolition and removal of the existing Haisla Bridge and approach access.