Performed engineering calculations for the steel structural elements in the wastewater treatment plant in Camrose and for the existing lift station upgrades.

The main structures include a new process building housing flocculation and coagulation tanks, alum tanks, HVAC, electrical, blower and lab spaces, and a 16.2 m square x 9 m tall in-situ 2-cell reinforced concrete MBBR tanks.

Project Engineer for blower building conversion upgrades.